Leaking Shower Repairs
April Showers    Waterproofing   Catalogue   Contact Info

       Step 3 - Removal of floor tiles and mortar bed 

        Removal of floor tiles and mortar bed - an electric
        jack hammer is recommended.


  • This makes the job much easier; if you hire one, back breaking work will be
    eliminated.

  • Before using the jack hammer, cover the shower drainage outlet with some tape
    as this prevents rubble from falling into the drainage system.

  • After the floor tiles and mortar bed have been removed, you will see what type of membrane was used previously ..... if any !

Next Step

Return to LEAKING SHOWER REPAIRSReturn to CATALOGUE
April Showers    Waterproofing